ThatLimitBreaker's Tree

From MinecraftOnline
Jump to navigation Jump to search
green_landscapes.png The Tree
GreatTree.png

This is a WIP build

About
Owner getplayerhead.sh?ThatLimitBreaker&16.png ThatLimitBreaker
Contributors getplayerhead.sh?ickyacky&16.png ickyacky, getplayerhead.sh?mk59apr&16.png mk59apr, getplayerhead.sh?WaffleNomster&16.png WaffleNomster
Category Landscapes
Underground? Partially
Public? Not Currently
Started March 2018
Completed Currently unfinished
Size north to south 201m
Size west to east 201m
Location
Coordinates X=-7896
Y=64
Z=-7689
Dimension Overworld
Map Link

getplayerhead.sh?ThatLimitBreaker&16.png ThatLimitBreaker's big ass tree build

This build is on hold for many reasons currently and may never be finished as I can't find the will to play Minecraft currently as I'm dealing with personal IRL issues.

Phase 1: The Dig

It is currently unknown when this phase began. Phase 1 was started on getplayerhead.sh?ThatLimitBreaker&16.png ThatLimitBreaker's first account, IndominusMosa. After about a month of work, with assistance from getplayerhead.sh?mk59apr&16.png mk59apr, all the dirt and sand had been successfully removed. After another month of work, about an 1/8th of the mining was complete. getplayerhead.sh?ickyacky&16.png ickyacky joins the scene and helps mine out 2/8th of hole. After a long break, ThatLimitBreaker returns to MCO and begins work on the hole once more. Nearly 2 weeks later, 3/4ths of the dig was complete. The last part took much longer (about 2 weeks) to mine out as all Limit's efficiency 5 picks were used up. getplayerhead.sh?WaffleNomster&16.png WaffleNomster joins at the end and helps mine out some of what's left. After 2 days of work, Limit finishes mining the rest of the hole out and officially completes Phase 1 on June 14th, 2019, at 4:22PM EDT.

Phase 2: Clean Up

Phase 2 began about an hour after Phase 1 was complete and took about 2 days to fully finish. This phase consisted of constructing a 20 block smaller circle inside the larger one. Once this smaller circle was complete all of the stone going from the outside to the barrier wall was mined out and any holes filled with stone. Then several double chests full of dirt were placed down to form a massive ring of dirt, which will soon be turned to grass. The river was also moved forward in way of a small canal. This phase also consisted of cleaning up the barrier wall and making sure it was fully stone. This phase was done completely by getplayerhead.sh?ThatLimitBreaker&16.png ThatLimitBreaker and took about 4 hours of work to mine out the ring, another 2 to fill in holes with stone, and another 2 to place down all the dirt and construct the small canal, and was officially completed on June 16th, 2019, at 4:50PM EDT.

Phase 3

Work In Progress