ThatLimitBreaker's Tree
The Tree | |
This is a WIP build | |
About | |
---|---|
Owner | ThatLimitBreaker |
Contributors | ickyacky, mk59apr, WaffleNomster |
Category | Landscapes |
Underground? | Partially |
Public? | Not Currently |
Started | March 2018 |
Completed | Currently unfinished |
Size north to south | 201m |
Size west to east | 201m |
Location | |
Coordinates | X=-7896 Y=64 Z=-7689 |
Dimension | Overworld |
Map Link |
ThatLimitBreaker's big ass tree build
This build is on hold for many reasons currently and may never be finished as I can't find the will to play Minecraft currently as I'm dealing with personal IRL issues.
Phase 1: The Dig
It is currently unknown when this phase began. Phase 1 was started on ThatLimitBreaker's first account, IndominusMosa. After about a month of work, with assistance from mk59apr, all the dirt and sand had been successfully removed. After another month of work, about an 1/8th of the mining was complete. ickyacky joins the scene and helps mine out 2/8th of hole. After a long break, ThatLimitBreaker returns to MCO and begins work on the hole once more. Nearly 2 weeks later, 3/4ths of the dig was complete. The last part took much longer (about 2 weeks) to mine out as all Limit's efficiency 5 picks were used up. WaffleNomster joins at the end and helps mine out some of what's left. After 2 days of work, Limit finishes mining the rest of the hole out and officially completes Phase 1 on June 14th, 2019, at 4:22PM EDT.
Phase 2: Clean Up
Phase 2 began about an hour after Phase 1 was complete and took about 2 days to fully finish. This phase consisted of constructing a 20 block smaller circle inside the larger one. Once this smaller circle was complete all of the stone going from the outside to the barrier wall was mined out and any holes filled with stone. Then several double chests full of dirt were placed down to form a massive ring of dirt, which will soon be turned to grass. The river was also moved forward in way of a small canal. This phase also consisted of cleaning up the barrier wall and making sure it was fully stone. This phase was done completely by ThatLimitBreaker and took about 4 hours of work to mine out the ring, another 2 to fill in holes with stone, and another 2 to place down all the dirt and construct the small canal, and was officially completed on June 16th, 2019, at 4:50PM EDT.
Phase 3
Work In Progress