Endonian Bridge and Pathway Association

From MinecraftOnline
Jump to navigation Jump to search

The Endonian Bridge and Pathway Association (EPBA) was created by getplayerhead.sh?ChivalricCode&16.png ChivalricCode to improve End roadways. Ownership was transferred to getplayerhead.sh?abamacus&16.png abamacus on 2024-01-12 (Verified getplayerhead.sh?ChivalricCode&16.png ChivalricCode). It includes all blocks placed and owned by getplayerhead.sh?ChivalricCode&16.png ChivalricCode or his alts in the End.

Headquarters at 1232, 77, -406

Rules:

  • Bridges and roads need to have at least a 2 blocks wide road surface. Finished builds need to adhere to these rules.
  • Bridges need to have railings to prevent falling into the void at both sides, corners, beginning and end.
  • Bridges need to be safe to travel. Prevent endermen spawning on them. Also build high grade and match connection to the connected.
  • Bridges need to have 4 blocks overhead clearance, unless it's an ice road or viaduct.

Agreement board:

  • By adding your name to the permission board you agree to reciprocal and subcontracting permissions to unfinished roads and bridges labeled with an EBPA permission sign. Permission is revoked if used in bad faith for the purpose of griefing, downgrading, harvesting of blocks or mischief.
  • Permission is for the purpose of upgrading, finishing, moving, integrating and connecting, but not for the purpose of yeeting.

Signage:

  • EBPA buildsite permission // PlayerName -- Upgrading, moving, finishing, integrating, and connecting
  • EBPA connect permission // PlayerName -- Only permission to connect to it, the build is considered finished.
  • EBPA project no permission // PlayerName -- No permission. High grade builds. Only builders have perms.

Once a project is finished, the perm can be down-graded.