Pespla Local Thoroughfare
Pespla Local Thoroughfare | |
An image of several players gathered around the New United States Junction | |
About | |
---|---|
Owner | Heruvian Federation |
Contributors | See contributors |
Category | Infrastructure |
Underground? | No |
Public? | Yes |
Started | 17 December 2022 |
Completed | TBA |
Location | |
Coordinates | X=-15747 Y=76 Z=-4594 |
Dimension | Overworld |
Settlement | [[Heruvian Federation Mount Pespla Windowsland Sunset Village Ada ville]] |
Map Link |
Overview
The Pespla Local Thoroughfare (HWC1-I110) is a road that aims to connect all of the settlements in the Mount Pespla Region.
This road is part of the Heruvian Interstate Project, but is not a controlled-access highway.
The road is in need of proper lighting, as well as kilometer markers.
The road is located on y=72, but does not have to exclusively lie on it.
Note: Anyone can build/contribute to this project, as long as they follow the build pattern. Ask George_Mann for more info.
Off-ramps and Other Connections
Interchange to Heruvian North Inner Corridor Highway y=86: (-15747, -4594)
Off ramp to Sunset Village and Ada Ville ground level: (-15747, -4495)
Junction to CornerStone y=66 (ground level): (-15723,-3585)
Builders and Other Contributors
- George_Mann
- Luigifan100 (Cake)
- Txkeykeeper (Moral Support)
- ahri_29 (Permission)
- Anubis773 (Permission)
- Snakythey (Moral Support and permission)
- JCobbler2012 (Moral support and permission)
Timeline
~2022: Project conceptualized with a primary destination set as Mount Pespla with permission from Anubis773.
~2023: Permission reaffirmed by Mount Pespla's new leadership, Ahri_29.
December 17, 2022: Interchange constructed off of Heruvian North Inner Corridor Highway and destination changed to Ada Ville.
December 23, 2022: Road completed.
July 2023: Project reopened as snakythey expresses interest in constructing a road link for CornerStone.
July 18, 2023: Preliminary destination set to extend the road to CornerStone.
July 20, 2023: JCobbler2012 grants permission for the road to be built through Sunset Village.
July 24, 2023: Construction restarts.
July 25, 2023: Preliminary destination CornerStone reached.