World Trade Center
- This Article is about the World Trade Center (2001 - Present) in Port Beerian. For the Twin Towers (1973 - 2001) in Newport, see Twin Towers.
World Trade Center Complex | |
View of the Complex. January 2023. | |
About | |
---|---|
Owner | MSWindows (2022 - Present) MS Inc. |
Contributors | JCobbler2012 NedHuman SadieSadie AdoreKitten JesusMRS |
Category | Complexes |
Underground? | No |
Public? | Yes |
Started | 1 WTC - 20 August 2022
2 WTC - 3 September 2022 3 WTC - 24 October 2022 4 WTC - 4 January 2023 5 WTC - 13 March 2023 7 WTC - 24 October 2022 Memorial - 27 January 2023 PAC - 1 January 2023 The Oculus - 12 September 2022 Liberty Park - 12 March 2023 |
Completed | 1 WTC - 3 September 2022
2 WTC - 24 September 2022 3 WTC - 1 January 2023 4 WTC - 29 January 2023 5 WTC - 14 March 2023 7 WTC - 30 December 2022 Memorial - 29 January 2023 PAC - 1 January 2023 The Oculus - TBA Liberty Park - 15 March 2023 |
Location | |
Coordinates | X=-14973 Y=63 Z=-4695 |
Dimension | Overworld |
Settlement | Port Beerian |
Map Link |
Overview
The World Trade Center is a complex of buildings situated in Port Beerian. It is based on the Modern World Trade Center (2001 - Present) with an upcoming revolutionary Metro System which is located inside The Oculus (Transport Hub).
The complex is Owned by MSWindows (2022 - Present).
One World Trade Center
1 World Trade Center, also known as One World Trade, One WTC, and formerly the Skyline Towers Moniker as a codename during early stages, is located towards the South Western Side of the Complex and is notably identified by it's Iconic Spire and it's unarguably tall and defiant position among the rest.
Owners / Tenants
Fields marked with a Dash (-) are considered Vacant or Empty but are still owned by MSWindows.
Fields marked with an Asterisk (*) are considered to be pending or undergoing a change in status.
Floor | Owners |
---|---|
29 | Roof Access / Spire Mainframe |
28 | MSWindows's Living Quarters / Office Room |
27 | - |
26 | Xanpi3000 |
25 | - |
24 | - |
23 | - |
22 | - |
21 | - |
20 | FuzbolMC |
19 | - |
18 | - |
17 | - |
16 | - |
15 | - |
14 | - |
13 | - |
12 | - |
11 | - |
10 | - |
9 | - |
8 | - |
7 | - |
6 | - |
5 | - |
4 | - |
3 | - |
2 | - |
1 | Main Lobby |
History
Development on The World Trade Center started on 20 August 2022 in Port Beerian after MSWindows had a visionary of recreating the Modern World Trade Center in MinecraftOnline. This was originally planned to be built in Newport but ultimately failed to work after finding it unsuitable, mainly it's land requirements and Proprietary Standards. Another Reason was that MSWindows's visionary of a revolutionary Metro System would likely not materialize. This was built under codename Skyline Towers.
- On September 3, 2022, 1 WTC was completed after MSWindows topped the Spire with an End Rod. At the same time, MSWindows was approached by one of Port Beerian's Owners, JCobbler2012 with the idea of building the Entire Modern World Trade Center Complex alongside it. MSWindows agreed on it and development on 2 WTC began.
- On September 12, 2022, Development on The Oculus (Transport Hub) began alongside the Development of 2 WTC.
- On September 24, 2022, 2 WTC was completed. At the same time, Development on The Oculus was Halted for reasons based on the Metro System's Requirements. Development on The Oculus and its Metro System will resume when Freedonia's Servers Update to 1.16.5.
- On October 1, 2022, Partial Ownership of The Oculus was allocated to the company Metroline.
- On October 4, 2022, Development on the site as a whole halted for a variety of reasons.
- On October 26, 2022, The Site was renamed to World Trade Center for a number of reasons. Some of these being that many often referred it as 'World Trade Center' or 'WTC' and that the codename Skyline Towers brought ambiguity for people thinking it is located in the city Skyline.
- On December 30, 2022, 7 WTC was completed. 3 WTC was completed 2 days later. 3 WTC was decided by JCobbler2012, NedHuman to contain many of the settlements farms.
- On Janurary 1, 2023, The Performing Arts Center was build and finished the same day.
- On Janurary 4, 2023, construction on 4 WTC began.
- On Janurary 27, 2023, The Memorial began construction. JesusMRS helped level a hill nearby. The Memorial was finished two days later.
- On Janurary 29, 2023, 4 WTC was completed.
- On March 12, 2023, Liberty Park began construction. It was finished the next day.
- On March 13, 2023, 5 WTC began construction. It was completed on March 15, 2023.
Post-construction History
- On September 11, 2023, the pools within the WTC Memorial were lit up with beacons, as an homage to the actual Tribute in Light within New York City.
Contributors
- MSWindows - Lead Project Developer and Owner of the Complex.
- JCobbler2012 - De-facto Project Developer, Builder.
- NedHuman - Builder and Supplier. (Banned)
- SadieSadie - Builder
- AdoreKitten - Excavator
- JesusMRS - Excavator