Kanal Town Subway
Kanal Town Local Rail System | |
The Nexus Station along the Dernal Line. | |
About | |
---|---|
Owner | SiOtter |
Contributors | BomBardyGamer |
Category | Infrastructure |
Underground? | Partly |
Public? | Yes |
Started | November 17th 2023 |
Completed | Phase 1, 14/2/24 |
Location | |
Coordinates | X=-9255 Y=48 Z=1536 |
Dimension | Overworld |
Settlement | Kanal Town |
Map Link |
The Kanal Town Subway is a subway network operated by the SCR company inside of Kanal Town. Currently it has 14 stations spread across 3 lines.
Stations
Great Lakes Line
Part of the Great Lakes Line is incorporated into the local system, it provides direct commuter rail to the communities of Maple Ridge and Chilliwack from Kanal Town.
Station ID | Station Name | Town | Line |
---|---|---|---|
GL6 | Ridgeline Stop | Maple Ridge | Great Lakes, Dernal Line |
GL1 | Sandbar Station | Kanal Town | Great Lakes, Western Express, Dernal Line |
GL2 | Chilliwack Stop | Chilliwack | Great Lakes |
Dernal Line
The Dernal Line is a line that goes from Dernal National Park to Acadia Dock, it covers multiple stations, is mostly underground, and has stations at or near multiple tourist attractions.
Station ID | Station Name | Town | Line |
---|---|---|---|
D9 | Ridgeline Stop | Maple Ridge | Dernal Line, Great Lakes Line |
D8 | Basalt Station | Kanal Town | Dernal Line |
D7 | Acadia Dock Station | Kanal Town | Dernal Line |
D6 | DarkOak Dock Station | Kanal Town | Dernal Line |
D5 | Kanal Town Nexus | Kanal Town | Dernal Line, Crasher Line |
D4 | Sandbar Station | Kanal Town | Dernal Line, Western Express, Great Lakes Line |
D3 | Old Kanal Town Station | Kanal Town | Dernal Line |
D2 | Orca Bathhouse | Kanal Town | Dernal Line |
D1 | Dernal National Park | Kanal Town | Dernal Line |
Crasher Line
The Crasher Line runs from the Kanal Town Stadium into a terminus at the Dernal Highlands, it also stops at the Industrial District next to the xp and glass farm.
Station ID | Station Name | Town | Line |
---|---|---|---|
C7 | Ski Hill | Kanal Town | Crasher Line |
C6 | Tunnel | Kanal Town | Crasher Line |
C5 | Highlands Station | Kanal Town | Crasher Line |
C4 | Kanal Town Nexus | Kanal Town | Crasher Line, Dernal line |
C3 | Industrial Stop | Kanal Town | Dernal Line |
C2 | Library Station | Kanal Town | Crasher Line |
C1 | Stadium Station | Kanal Town | Dernal Line |
Map
History
Prior Concepts
Since 2018 SiOtter has spitballed the idea of a subway network or local rail within the Kanal Town area. The idea was a train running from Mount Dernal into New Kanal Town; the plans were scrapped upon his ban. Another subway almost happened in 2020 when the nexus was installed but unfortunately SiOtter went on a break before he had a chance to start. In September 2023 SiOtter would begin work with CarCrasher13 on the Spawn Continental Railway connection to Chilliwack, a third concept was submitted for a north-south line but was put down due to a lack of materials.
Phase 1
Phase 1 began in November 2023 to better connect the Kanal Town nexus building to the nearby auction house. A tunnel was dug and the Kanal Town Subway stretched from the Sandbar Station to the nexus, and then to the dark-oak dock near the auction house. The line would see regular use for people traveling to the many server auctions held in the building. In February 2024 red_sporb would approach SiOtter about modernizing the subway a bit more by turning its walls into stone brick. This partnership grew and both of them began to work on extending the subway; now renamed the Dernal Line across multiple other stations in order to better connect various tourist attractions in the town.
Phase 2
Phase 2 began in February 2024 with the creation of the Crasher Line, the first part to open was from the Kanal Town Nexus to the cities stadium. This was followed by stations at the Public Library and Industrial District. The crasher line is planned to run north-south and eventually go into the southern Dernal Highlands with its final station. The line was made by SiOtter and red_sporb.
Phase 2A
Phase 2A was the expansion of the Dernal Line into Maple Ridge. The line extension was planned for Phase 1 but ultimately was left unfinished due to a few reasons. The extension was made by SiOtter, red_sporb, and BomBardyGamer. The crasher line was completed in March of 2024 with the completion of the Crasher Line with stations C6 and C7.
Phase 3
Set to begin April-May 2024.