Echoes
![]() | |
![]() The city flag of Echoes, on a banner. | |
About | |
---|---|
Founder | ![]() ![]() |
Owner | ![]() |
Contributors | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() See the Contributions list below for more information |
Category | Towns |
Underground? | No, a small section is however |
Fortified? | Yes |
Public access? | No |
Public build? | No |
Transport | |
Road link? | No |
Nexus link? | No |
Rail link? | No |
Boat link? | No |
Portal? | No |
Location | |
Dimension | Overworld |
Please contribute the coordinates of this settlement. |













Echoes is the third settlement created by the Black Starwalkers, and one currently in development. It was started from an idea dunechan originally had about a base made from designs from the BioShock series, but now is based on an idea
ZJTrayGamingYT made about ginormous bio-domes on top of the ocean.
Following dunechan's departure from the Black Starwalkers on January 22nd, 2025, Echoes' ownership went fully under
ZJTrayGamingYT.
By early August, a complete overhaul of Echoes as a settlement was created and fully planned, and was officially started with the beginning of the construction of the Hub Dome on August 7th, 2025.
Echoes was named after the song Echoes by rock group Pink Floyd, and the settlement flag partially resembles the album it came off of, Meddle. The song's name, and therefore the base's name originates from the word Echoes, which (in this context) means one who closely imitates or repeats another's words, ideas, or acts. This was applicable when naming it due to it's inspirations and combinations of styles.
About
Sections
Echoes currently has multiple sections (and other sections will be added as time goes on and information becomes publicly available). They are:
- The Hub Dome
- (dome construction began on August 7th, 2025, ended on September 19th, 2025)
- External Parts of Echoes
- North
- The North Cardinal Tunnel
- (construction began on September 8th, 2025, ended on September 14th, 2025)
- The Red Rose Speedway Metro Station (also known as the North Metro Station)
- (construction began and ended on September 14th, 2025)
- Magenta Sub-Tunnel
- (construction began on September 28th, 2025, ended on September 30th, 2025)
- Red Sub-Tunnel
- (construction began and ended on September 30th, 2025)
- Orange Sub-Tunnel
- (construction began on September 30th, 2025)
- The North Cardinal Tunnel
- North
Naming Schemes
Regarding certain naming schemes within Echoes:
- The Cardinal Tunnels are named after both the cardinal directions of a compass, and of the album Cardinal by indie rock group Pinegrove.
- Metro Stations
- The Red Rose Speedway Metro Station (the North Metro Station) is named after the album Red Rose Speedway by Paul McCartney and Wings.
Timeline
Pre-Departure Era
November 29th, 2024:
- Echoes is founded by
dunechan and
ZJTrayGamingYT
December 9th, 2024:
Ervoss filled in a hole.
Overhaul Era
January 22nd, 2025:
dunechan leaves the Black Starwalkers, and ownership of Echoes goes solely to
ZJTrayGamingYT.
August 1st, 2025 - August 4th, 2025:
ZJTrayGamingYT fully plans out sections of an overhauled Echoes, with
Ervoss helping some of the architecture ideas. Hundreds of thousands of materials are required to create the ginormous interconnected domes idea
ZJTrayGamingYT had planned.
Initial Hub Dome Creation
August 7th, 2025:
- Work finally begins on the massive scale of Echoes' planned gargantuan size.
ZJTrayGamingYT,
Ervoss, and
Vlkodlak148 begin the work on the hub dome with glass supplied by
Modified_2T22.
August 7th, 2025 - August 8th, 2025:
- Echoes' Hub Dome's main perimeter and underwater aspects are created and finalized by
ZJTrayGamingYT,
Ervoss, and
Vlkodlak148.
Modified_2T22 supplies even more amounts of glass.
August 8th, 2025:
Hyperluminous attempts to drain the water out of the interior area of Echoes' Hub Dome with sponges supplied by
Modified_2T22, but is met with complications as the ocean refills itself.
August 10th, 2025:
Excommunicated supplies glass.
Ervoss and
kubixolus start work on the above-water part of Echoes' Hub Dome.
August 13th, 2025 - August 14th, 2025:
kubixolus continues work on the above-water part of Echoes' Hub Dome.
August 16th, 2025:
ZJTrayGamingYT,
Ervoss, and
Vlkodlak148 gather a bunch of concrete for the upcoming extension to Echoes.
Vlkodlak148 drains a bit of Echoes' Hub Dome.
August 17th, 2025:
ZJTrayGamingYT and
Ervoss finish gathering all of the needed colored concrete, and stained glass.
ZJTrayGamingYT and
Ervoss continue working on the above-water part of Echoes' Hub Dome.
- Later in the day,
kubixolus continues work on the above-water part of Echoes' Hub Dome.
August 18th, 2025:
ZJTrayGamingYT and
Vlkodlak148 acquire tons of glass and start the process of manually draining Echoes' Hub Dome.
August 19th, 2025 - August 20th, 2025:
ZJTrayGamingYT reaches out to
Cosmic_potato_04 for assistance in getting an admin to drain the water inside of Echoes' Hub Dome. Over the course of an hour,
Cosmic_potato_04 completely drains the inside of Echoes' Hub Dome.
- After
Cosmic_potato_04 leaves, there are still large pockets of water to fill.
ZJTrayGamingYT,
Ervoss, and
Vlkodlak148 slowly chip away at them.
- A bit later,
ZJTrayGamingYT asks for help from
Korbs699, who helps by draining most of the leftover pockets.
ZJTrayGamingYT and
Vlkodlak148 continue work after
Korbs699 leaves, leaving only one real pocket left that requires draining.
Work on the North Sections
North Cardinal Tunnel's Construction
September 8th, 2025 - September 9th, 2025:
ZJTrayGamingYT and
Ervoss begin the construction of the North Cardinal Tunnel.
September 9th, 2025:
Ervoss,
kubixolus,
Hyperluminous, and
Vlkodlak148 continue the construction of the North Cardinal Tunnel.
September 10th, 2025:
Hyperluminous, and
Vlkodlak148 continue the construction of the North Cardinal Tunnel, with
Vlkodlak148 draining parts of it.
September 11th, 2025:
Vlkodlak148 continues slowly draining parts of the North Cardinal Tunnel.
MrSlimeDiamond drains out the entirety of the North Cardinal Tunnel, after
Vlkodlak148 had partially drained out some of it.
September 12th, 2025:
ZJTrayGamingYT and
Ervoss continue the construction of the North Cardinal Tunnel.
September 13th, 2025 - September 14th, 2025:
ZJTrayGamingYT and
Ervoss continue the construction of the North Cardinal Tunnel, nearly finishing it in the early hours of the morning.
Vlkodlak148 continued digging ahead of where the North Cardinal Tunnel ended, and went past what was needed.
- During the final hours of September 13th, and early into the morning of September 14th, the North Cardinal Tunnel was completely finished.
ZJTrayGamingYT and
Ervoss then began the start of the Red Rose Speedway Metro Station, and completed most of it before logging off.
Vlkodlak148 shows up and completes the Red Rose Speedway Metro Station, with
ZJTrayGamingYT finishing it with minor touchups.
Late September 14th, 2025 - Early September 17th, 2025:
ZeroDouble continues work done on Echoes' Hub Dome, placing LOADS of glass!
September 19th, 2025:
- With tons of hours spent on it,
ZeroDouble completes Echoes' Hub Dome, officially ending it's construction.
The North's Sub-Tunnels Construction
September 28th, 2025 - September 30th, 2025:
ZJTrayGamingYT and
Ervoss excavate the area, and completely finish the Magenta Sub-Tunnel.
- After it's completion,
ChatGBT drains out the entirety of the Magenta Sub-Tunnel.
September 30th, 2025:
ZJTrayGamingYT and
Vlkodlak148 begin excavating the area for the Red Sub-Tunnel, and begin building it.
Draggonne completely finishes the Red Sub-Tunnel.
ZJTrayGamingYT and
Ervoss begin excavating the area for the Orange Sub-Tunnel.
October 1st 2025 - October 2nd, 2025:
ZJTrayGamingYT and
Ervoss finish excavating the area for the Orange Sub-Tunnel.
Members
Founders
Both founders have contributed to Echoes, although in different Eras.
ZJTrayGamingYT
- (contributed partially in the Pre-Departure Era)
- (main architect and member of the Build Team for the Overhaul Era)
dunechan
- (main architect and contributor of the Pre-Departure Era)
Contributors
Pre-Departure Contributors
People who have contributed to Echoes in the original Pre-Departure version of Echoes.
retrorandom
- (former BSW member, member of the Pre-Departure Era Build Team)
Post-Departure Contributors
People who have contributed to Echoes in the current Overhaul Era version of Echoes.
Ervoss
- (assistant architect and member of the Overhaul Era Build Team)
Vlkodlak148
- (member of the Overhaul Era Build Team)
Modified_2T22
- (logistics manager for the Overhaul Era Build Team)
Hyperluminous
- (member of the Overhaul Era Build Team)
Excommunicated
- (logistics assistant for the Overhaul Era Build Team)
kubixolus
- (member of the Overhaul Era Build Team)
ZeroDouble
- (member of the Overhaul Era Build Team)
Draggonne
- (member of the Overhaul Era Build Team)
Non-BSW Contributors
Cosmic_potato_04
- (drained Echoes' Hub Dome)
Korbs699
- (helped finish draining Echoes' Hub Dome)
baltxe
- (former BSW member, assisted in placing glass for the Hub Dome)
MrSlimeDiamond
- (drained the North Cardinal Tunnel)
ChatGBT
- (drained the Magenta Sub-Tunnel)